ADU Builders Warning Signs Every Homeowner Should Know
Nevada law puts a hard ceiling on how much money a contractor can collect before work starts. Most homeowners don’t know the ceiling exists, which is why handing over 30% to 50% upfront still happens every week in Henderson. The contractor asking for it is often licensed, often confident, and often good at sounding reasonable. The damage shows up later: in the contract language nobody read closely, in the payment schedule with no milestones attached, in the permit board left blank for six weeks. This guide walks through what those warning signs actually look like, how to verify a Nevada contractor’s standing, and the questions that separate prepared firms from ones running on confidence alone. You’ll finish it knowing what to check before you sign anything.
Quick Answer
The biggest ADU builder warning signs in Henderson are deposit requests above Nevada’s statutory limit, contracts missing a written warranty or permit timeline, vague “we’ll handle everything” promises that never get put on paper, and a license that isn’t verified as bonded and insured. Most problem contractors are licensed and sound credible, so the risk lives in the paperwork, not in obvious red flags. Verify the license, read the payment schedule, and get scope and change-order terms in writing before signing.
Table of Contents
- What Nevada law says about contractor deposits (and the 10% rule)
- What a compliant payment schedule looks like
- The contract omissions that signal real risk
- How to verify a Nevada contractor license the right way
- The verbal promises that never make it into writing
- Permits and Henderson’s ADU rules
- Questions to ask before signing anything
What Nevada law says about contractor deposits (and the 10% rule)
Nevada Revised Statutes 624.700 sets a ceiling on deposits for residential construction. A contractor cannot collect more than 10% of the contract price, and cannot accept more than $1,000 total, before the project begins work. The limit exists to keep a contractor from using one homeowner’s deposit to fund a different job. When a builder asks for 30% or 40% down before mobilizing, that request sits outside the statute.
In our experience, the deposit demand rarely arrives as the first red flag. It usually shows up after a strong sales conversation and a competitive bid, at the moment the homeowner is most committed. The build feels real, the timeline feels close, and the ask sounds routine. Henderson homeowners who’ve been burned before almost always describe the same pattern: a wire transfer before a shovel hit the ground, followed by weeks of silence while the contractor sorted out permits they hadn’t pulled.
What to check on the deposit clause:
- The percentage: anything above 10% before work starts should prompt a hard question.
- The timing: the deposit shouldn’t be due until the contract is signed and permits are confirmed.
- The total: the statute also caps the pre-work total at $1,000, so a percentage that exceeds it still violates the limit.
- The method: legitimate builders accept check or card with a written receipt. Wire-only requests deserve scrutiny.
If a builder argues the 10% limit doesn’t apply because they’re a “design-build firm” or an “ADU platform,” that’s a reading you want verified before money moves. The statute covers residential construction; an ADU with a foundation, framing, and utility connections is residential construction.
What a compliant payment schedule looks like
A compliant payment schedule ties every dollar to a construction milestone. You’re paying for completed, inspected work, not for a contractor’s cash flow. When we build in Henderson, the schedule assumes permits are pulled first and the first draw is small.
A typical milestone schedule for a backyard ADU or garage conversion looks like this:
- Contract signature. A small deposit within the statutory limit. Nothing more.
- Permit issued. A second draw releases after the city issues permits, not when the application is filed.
- Foundation complete. Payment follows framing anchor bolts and a passed inspection.
- Framing and rough-in. Release after framing, electrical, plumbing, and mechanical rough-ins pass inspection.
- Drywall and insulation. Milestone payment releases after the wall assembly is inspected.
- Finishes and punch list. Final payment holds until the punch list is signed off and you’ve walked the unit.
What to watch for in the schedule you’re handed:
- Any line for “materials draw” with no inspection attached.
- A final payment that’s only 5% or less, which gives the builder no real reason to finish the punch list.
- A schedule that requires the full contract amount to be paid before the final inspection passes.
- Numbers that don’t add up to the contract total.
Ask the builder to walk you through the schedule line by line against the inspection calendar. A prepared firm can do it without notes. If the answer is “don’t worry, it’s standard,” that’s an answer.
The contract omissions that signal real risk
The most reliable warning signs are things a contract doesn’t say. Missing language is harder to spot than bad language, which is exactly why it works for the wrong kind of builder. Here’s what gets left out and why it matters.
No written warranty. A warranty is a written commitment to fix defects after the final payment clears. If the contract is silent on warranty terms – how long it runs, what it covers, how a claim gets processed – the only warranty you have is a verbal promise. On an ADU that represents six figures of construction, that’s a serious gap.
No permit timeline. A permit timeline names the date permits will be submitted and the expected issuance window. Without that language, the schedule has no floor. Henderson’s permitting office has a set review cycle; a builder who won’t commit to dates is signaling they haven’t built here much or don’t want to be held to a timeline.
No defined scope of work. The scope of work should be specific enough that a subcontractor could build from it. “ADU, 600 square feet, finish per plans” is not a scope. It should name square footage, ceiling heights, window types, siding (we standardly use James Hardie products), fixture rough-in counts, appliance allowances, and sitework.
No change-order process. Every project has changes. The question is how they’re handled. A written change-order process requires a signed amendment with dollar amount and time impact before the work is performed. Without it, “small changes” turn into a lump-sum surprise at the final invoice.
No lien waiver requirement. Subcontractors and suppliers can file a mechanic’s lien against your property if they aren’t paid, even if you paid the general contractor. The contract should require the general to collect and provide conditional lien waivers with each payment.
Compare across three bids. The competitor that looks “more expensive” often has the warranty, the change-order process, and the lien waiver language in the contract. The cheaper bid may simply have left all three out.
How to verify a Nevada contractor license the right way
When a contractor says “we’re licensed,” that’s one fact. “Bonded,” “insured,” and “in good standing” are three more, and they’re checked separately. A license alone guarantees none of the rest.
To verify a Nevada contractor license properly:
- Search the license by number. The Nevada State Contractors Board maintains a public license lookup. Search by the license number the contractor provides, not the company name.
- Confirm the classification. Residential construction requires a Residential classification (B-2 or a specialty license). A classification for commercial work doesn’t cover your project.
- Confirm “in good standing.” The board page shows whether the license is active, current, suspended, or under disciplinary review. A suspended license can look identical to a valid one on a business card.
- Verify the bond. Nevada requires residential contractors to carry a surety bond on file with the board. Confirm the bond is current. If the contractor can’t tell you their bond carrier, that’s a warning sign.
- Ask for a certificate of insurance naming the general liability carrier, policy number, and policy limit – then call the carrier to confirm the policy is active.
- Confirm workers’ compensation coverage. If the contractor employs anyone, they need workers’ comp. Owners’ personal health insurance does not cover an employee injured on your property.
We send the license number, the bond carrier, and the certificate of insurance with the written price, because the homeowner shouldn’t have to ask twice. If you’re comparing ADU builders in Henderson, the request for those documents is where prepared firms and confident ones separate.
The verbal promises that never make it into writing
The most expensive words in residential construction are the ones said out loud but never signed. Here are the phrases that should trigger a written follow-up before the contract is signed.
“We’ll handle everything.” Handle what, exactly? Permit filing, plan review fees, inspection scheduling, utility transfers, HOA coordination, demolition haul-off? “Everything” usually turns out to mean the items the builder thought were obvious. Write the list. If a builder won’t commit it to paper, the list is shorter than you think.
“That’s included.” Included in the base price, or included as an allowance? Those are different numbers. Get the line item added to the scope of work with the dollar figure attached.
“We don’t need a permit for that.” In Henderson, any new habitable structure requires a building permit. A garage conversion requires a permit because the use changes. An accessory dwelling unit requires a permit, plan review, and inspections. A contractor who says a permit isn’t needed is either unfamiliar with the local code or planning work that will fail inspection later. Both outcomes cost you money.
“We’ll pull the permit next week.” A permit timeline with no language behind it is a hope, not a commitment. Put the permit submission date and the expected issuance date in the contract with a definition of what happens if it slips.
“Don’t worry about the HOA.” In Henderson neighborhoods from Green Valley to Anthem, HOA approval is often required before the city will approve the permit. The builder who says it’s fine either knows your specific HOA’s rules or hasn’t checked. Ask which.
“Same crew the whole time.” Worth confirming on paper. Background-checked, uniformed crews are a different standard than whatever crew happens to be available on the day. Ask who’ll be on site and how the crew is vetted.
When we quote a Henderson ADU, the written price that goes to you covers what the crew is actually going to build, the permit timeline, the change-order process, and the one-year guarantee terms – not a verbal sketch of the same. The Garrison Standard is the checklist we build to: show up in the window, price in writing, by the book, leave it clean, stand behind it for a year.
Permits and Henderson’s ADU rules
Henderson has been active on ADU rules in recent years, and the permitting path depends on which overlay your property falls into. A backyard ADU on a lot in Cadence may face different setback requirements than the same structure in Old Henderson. Setback variance – the city’s written permission to build closer to the property line than the standard rule allows – is sometimes available, but it’s a process, not a shortcut.
What a permit-compliant ADU project involves in Henderson:
- A pre-application or plan submittal to the Henderson building department with a site plan, elevations, and floor plan.
- Plan review, which often runs several weeks depending on the workload and whether the submission is complete.
- Possible HOA architectural review, depending on the subdivision.
- Building permits issued with a defined inspection sequence: foundation, framing, rough-in, insulation, drywall, final.
- Final inspection and certificate of occupancy before the unit is habitable.
A builder who hasn’t pulled a permit in Henderson in the past year should be asked how they plan to navigate current review times. “We’ll figure it out” is not a permit timeline. The permit path is one of the main things that separates a prepared ADU builder doing real ADU work in Henderson from a firm learning on your project.
Questions to ask before signing anything
Ten questions, asked in a single phone call, will sort prepared builders from confident ones. The answers matter less than the speed and specificity. A builder who’s done this work has the answers on the tip of their tongue.
- What is your Nevada contractor license number, and what classification does it carry?
- Who is your surety bond carrier, and can you send the certificate of insurance today?
- What is the deposit, and how does it fit within the R.S. 624.700 limit?
- Can you walk me through the payment schedule milestone by milestone?
- What’s the permit submission date, and how long does Henderson plan review usually take?
- What does your written warranty cover, and how does a claim get processed?
- How do change orders work, and will the price be in writing before work begins?
- What’s in the scope of work – siding material, window type, finish allowances, sitework?
- Who will be on site, and how are those crew members vetted?
- What happens if the work fails within the first year?
The builder who answers all ten in a brief, specific way and follows up with the documents is the one you want. The builder who says “the contract covers that, don’t worry” hasn’t answered any of them.
Common Mistakes to Avoid
- Paying a large deposit to “hold your spot.” Nevada caps the deposit at 10% of contract price and $1,000 total before work begins. Anything above that ceiling is a legal violation, not a reservation.
- Signing without a written warranty. A verbal warranty is worth what it costs you, which is nothing when the final payment clears and the punch list hasn’t landed.
- Trusting a license you haven’t verified. A business card doesn’t show whether the license is active, bonded, or in disciplinary review. The Nevada State Contractors Board lookup does.
- Accepting “that’s included” as a line item. “Included” without a dollar figure in the scope of work is a verbal promise dressed up as a price.
- Assuming the permit doesn’t apply. In Henderson, a garage conversion, ADU, or room addition requires permits and inspections. Unpermitted work is a future sale problem, an insurance problem, and sometimes a teardown problem.
- Skipping the change-order process. Without a signed amendment, “small changes” morph into a final invoice that looks more like a variation of the original bid than the price you approved.
- Forgetting the HOA. Henderson subdivisions from Green Valley to Seven Hills often require HOA architectural approval alongside city permits. The builder who ignores this is planning to deal with it later. That’s your problem by then.
When to Call a Professional
If you’re early in the planning stage and want a real number before you commit – garage conversion, backyard ADU, or a room addition – the conversation is easier before the contract is signed than after. If your existing builder is asking for a deposit above the Nevada limit, isn’t providing a written warranty, or can’t produce a permit timeline, a second opinion is worth the call. If a permit has been filed but stalled for weeks, or an inspection failed and the fix plan isn’t in writing, that’s the moment to get a professional set of eyes on it.
We build in Henderson to The Garrison Standard: the price goes in writing before any work starts, permits get pulled and inspections get passed, and every project is backed in writing for a full year. Fielding ADU Builders Henderson offers free estimates in Henderson – call (855) 953-5331. A live person answers around the clock.
Frequently Asked Questions

Nevada Revised Statutes 624.700 caps the pre-work deposit at 10% of the contract price and $1,000 total. A compliant builder collects no more than that before mobilizing. Anything from 20% to 50% upfront sits outside the statute and warrants a hard conversation. Call (855) 953-5331 for a written price and payment schedule, free.
“Licensed” means the contractor holds an active license with the Nevada State Contractors Board. It does not by itself mean bonded, insured, or in good standing. Those are three separate checks you run through the board’s public lookup and the contractor’s insurance certificate. Call us if you want to see what a complete document package looks like before you sign.
Yes. A written warranty spells out what’s covered, for how long, and how a claim gets processed. Without one, defects that surface in the first year become a negotiation between you and the installer’s goodwill. The Garrison Standard warranty covers workmanship for 365 days in writing, and if the work fails we return and correct it at no charge.
Yes. A garage conversion in Henderson changes the occupancy of the structure and requires a building permit with plan review and inspections. Any contractor who tells you a permit isn’t needed for a garage conversion is either unfamiliar with the local code or planning work that will fail inspection. Call (855) 953-5331 to talk through the permit path for your specific lot.
An included line item is a fixed price. An allowance is a placeholder with a number attached that gets reconciled after the work is done, so the final number can move. Ask the builder to convert allowances to fixed dollar lines in the scope of work wherever possible. Free second opinions on contract language are part of our estimate process – call (855) 953-5331.
It depends on the size and complexity, but plan review plus construction on a backyard ADU typically runs several months once permits are in hand. Prefab platforms like Boxabl and Plant Prefab can shorten on-site construction time; site work and utility connections still follow the same permit path. Call for a milestone schedule specific to your project, free.
The Bottom Line
The ADU builder who does the most damage isn’t obviously reckless. They’re licensed, confident, and pleasant to talk to. They give a price that feels just reasonable enough. What separates them isn’t the sales pitch – it’s the paperwork: a deposit within Nevada’s statutory limit, a payment schedule tied to milestones and inspections, a written warranty with a real claim process, a permit timeline with dates, and a change-order process that keeps “small changes” from becoming a final-invoice surprise. Read the contract, verify the license, insist on writing, and treat any sentence that starts with “don’t worry” as the signal that it’s time to look closer.
If you’re planning a garage conversion, room addition, or backyard ADU in Henderson, we’d be glad to put a written price in front of you before any work starts. Call Fielding ADU Builders Henderson at (855) 953-5331. The estimate is free, and a live person answers whenever you call. Read more about our room addition work in Henderson or start from the Fielding ADU Builders Henderson home page.