







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Services in Enterprise, NV
If you’ve spent the last few months measuring your side yard against the setback line and getting nowhere, you’re in the right place. Enterprise homeowners call us with the same story: the lot looks big enough for a second unit until the pool equipment, the patio cover, and the HOA design committee all get a vote. We build ADUs, garage conversions, and room additions across Enterprise and answer every call with a live person, day or night. Call (855) 953-5331 to start with a free estimate.
Why Enterprise Homeowners Choose Fielding ADU Builders Henderson

We’re an independently owned member of the Garrison Partners family, building to The Garrison Standard since 2006: price in writing before any work starts, work done by the book, and a written one-year guarantee that most contractors won’t put on paper. Our technicians have up to 20 years of experience, and every crew member is background-checked and arrives in uniform, so you know exactly who is on your property.
In Enterprise, that matters. We work in ZIP 89139 and know the stretch of Silverado Ranch and Bermuda where the HOA review runs as long as the county permit. We’ve drawn plans for homeowners near Mountain’s Edge and along the Southern Highlands edge where the side-yard clearance number decides whether the project pencils out. Every project gets the same 365-Day Done Right Promise: if something we built fails within the year, we come back and correct it at no charge. That’s the whole pitch, and we keep it.
ADU Services We Offer in Enterprise
ADU Builders in Enterprise
A backyard detached unit, an attached junior suite, or a prefab platform from Cover or Dvele placed on a graded pad: we help you pick the build method that fits your Enterprise lot and budget, then carry it through county review and HOA design approval. Our team handles the site work, foundations, and finish-out so the unit matches your house instead of looking bolted on.
Learn more about our ADU Builders in Enterprise.

Garage Conversion Contractor in Enterprise
That oversized three-car garage isn’t doing much for you besides holding boxes. We convert it into a legal living unit with the insulation, egress, and cooling a desert conversion needs, and we do it inside the county’s permit process rather than around it. Because most Enterprise garages share a wall with the house, we plan carefully for fire separation and the HOA’s exterior rules at the same time.
Learn more about our Garage Conversion Contractor in Enterprise.

Room Addition Contractor in Enterprise
Sometimes the answer isn’t a second unit, it’s 400 more square feet on the back of the house. We build stick-frame additions with James Hardie siding that read as original to a 2000s tract home, and we pull the permits and pass the inspections so the square footage is real on paper. Multigenerational households in Enterprise ask for this often, and it’s usually the cheaper and faster route than a detached build.
Learn more about our Room Addition Contractor in Enterprise, or start from our home page to see the full range of work.

Neighborhoods We Serve in Enterprise
We work throughout Enterprise, with most projects clustered in the newer southwest subdivisions where lots are tight and the HOA is active. Typical response time for a site visit is a few business days, and we schedule around the summer heat.
- Mountain’s Edge
- Southern Highlands edge
- Silverado Ranch
- Bermuda Dunes
- Blue Diamond corridor
Why Enterprise’s Climate & Housing Affect ADU
Enterprise sits in the southwest Las Vegas Valley, where summer highs climb well past 100°F and the sun beats on an exposed roof for eight hours straight. That changes an ADU’s design. You need serious roof insulation, north-facing or shaded glazing, and oversized or zoned cooling, or the second unit becomes a furnace you can’t rent. It also changes the schedule: we pour slabs and apply stucco in the early morning, because concrete cured in peak afternoon heat cracks and stucco dries before it bonds.
The housing stock adds its own constraints. Nearly every Enterprise home is 2000s-and-later production suburban: two-story stucco and tile tract homes on small-to-mid lots, with pool-and-patio rear yards, block walls, and paved side strips. The block-wall-and-paver side yard is the default here, and that paved RV-style strip looks like the obvious ADU spot until you measure it against setback and the recorded wall-to-wall clearance. That’s where most first-pass plans die in Enterprise.
Pricing for ADU in Enterprise

You’ll get a written price before any work starts, and the number you approve on day one is the number on the final invoice. When you choose a prefab platform from Cover, Dvele, or Boxabl, the platform cost sits on top of site work, foundation, utilities, and permits.
- Garage conversion: typically $45,000 – $85,000 before permit fees, depending on cooling and finish level
- Room addition: roughly $220 – $340 per square foot for a permitted stick-frame build
- Detached ADU, conventional: commonly $180,000 – $320,000 all-in
- Prefab ADU placement: platform cost plus $40,000 – $90,000 for site prep, foundation, and utility ties
Learn more by reading our ADU Builders in Enterprise page. Call (855) 953-5331 for an exact quote. Estimates are free.
Service Area – Cities Near Enterprise
We also serve homeowners in surrounding communities, including Spring Valley, Paradise, Winchester, and Henderson. If your lot is just outside Enterprise, call and we’ll confirm coverage before we schedule a visit.
Serving Enterprise, NV – Our Local Coverage Area
We serve Enterprise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About ADU in Enterprise

A detached conventional ADU in Enterprise commonly runs $180,000 – $320,000 all-in, while a garage conversion is usually $45,000 – $85,000 before permit fees. The site work and lot constraints push the number more than the unit type does. Call (855) 953-5331 for an exact quote, and estimates are free.
No. You get a written price before any work starts, and that is the number on the final invoice. If a contractor you’ve talked to won’t put it in writing on day one, walk away. Call (855) 953-5331 to schedule your free estimate.
Yes. We pull the county permits, pass the inspections, and prepare the plans and documents your Enterprise HOA design committee needs to review, since the county code doesn’t overrule the HOA. Call (855) 953-5331 to get started.
A garage conversion typically takes about three to five months including permitting, and a detached ADU usually runs six to ten months. Summer heat can stretch the schedule, which is why we pour and plaster in the early morning. Call (855) 953-5331 for a realistic timeline on your lot.
It’s almost always the setback line combined with the recorded HOA wall-to-wall clearance, and the paved side strip usually measures smaller than it looks. We’ll measure it against both before you spend anything. Call (855) 953-5331 for a free estimate.
Contact
Whether you’re in Mountain’s Edge, near the Southern Highlands edge, or anywhere else in Enterprise, the next step is simple: call us for a free estimate. You’ll get a written price before any work starts, a background-checked crew in uniform, and a one-year written guarantee. Call (855) 953-5331 today.
Written by the team at Fielding ADU Builders.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local ADU pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Enterprise Customers Say
"Foundation and slab poured on schedule. Crew kept the yard orderly."
- Marian J."Honest feedback on what the lot could fit. Told me up front what would fit on the lot and what the setbacks would allow."
- Rita C."Solid job. Cabinet delivery was a week behind but they worked around it."
- Ben G.





