A new ADU that runs hot in summer is almost always an HVAC calculation problem from the design phase, not a unit malfunction. But homeowners are routinely sold a bigger mini-split instead of being told the ductwork or the load calculation was wrong from the start. The same pattern shows up again and again. Moisture at the slab, tripped breakers on a shared panel, cracking at the exterior corners. None of these are accidents. They were predictable during construction and skipped. In this guide, we walk through the five most common post-construction ADU defects we see in Henderson, what caused each one, and what a real fix looks like versus a cosmetic patch.
Quick Answer
Most post-construction ADU problems in Henderson come down to design errors, installation shortcuts, or material failures that were visible during the build. A legitimate fix addresses the root cause – not just the symptom – and often requires pulling a new permit. Cosmetic patches like extra caulk, a bigger mini-split, or a fresh coat of paint over a crack will fail again within a season in the desert climate.
Table of Contents
- Moisture Intrusion: Slab and Wall Assemblies
- HVAC Performance: Why the ADU Runs Hot or Cold
- Electrical Capacity: Tripped Breakers and Shared Panels
- Plumbing Venting: The Smell You Can’t Find
- Exterior Finish Cracking in Desert Heat
- Warranty vs. Maintenance: Who Pays for What
- What Documentation You Need for a Warranty Claim in Nevada
- DIY Fix, Licensed Trade, or New Permit?
Moisture Intrusion: Slab and Wall Assemblies
You’ll see it first at the base of an interior wall, usually on the north or east side of the ADU. A dark stain creeping up six to eight inches from the floor line, or a chalky white residue called efflorescence on the concrete. Sometimes a soft spot in the drywall behind a bathroom vanity. In Henderson, this is almost always a slab moisture problem or a wall-flashing problem, and the two get confused constantly.
Here’s what each looks like:
- Slab moisture: Staining concentrated at the base of walls that sit on grade, no visible water source above. Often appears after monsoon season (July through September) when the ground is saturated and the vapor barrier is missing, torn, or lapped the wrong direction.
- Wall flashing failure: Water tracks down the inside of the wall cavity from a window head, a roof-wall junction, or a penetration. You’ll see staining starting higher and running downward, and often find wet insulation by probing gently with a screwdriver.
- Stucco weep screed clogged or missing: Common on garage conversions where the original slab was never detailed for living-space water management. Stucco traps water at the base and pushes it inward.
The root cause is nearly always one of three things. The vapor barrier was underspecified for the soil conditions. The stucco detail at grade wasn’t brought to the right height above finished grade. Or the concrete was poured without a capillary break. In Henderson, the caliche-heavy soil and the dramatic day-night temperature swings make slab moisture worse than in coastal climates because the concrete holds moisture longer.
The real fix depends on the source. Slab moisture usually means excavating the exterior perimeter, installing a proper drainage plane, and re-detailing the stucco weep screed – which requires a permit if it modifies the building envelope. Wall flashing means opening the wall, replacing the flashing, and re-sheathing any compromised framing. Caulking the interior baseboard and painting over it is not a fix. It buys you one season.
HVAC Performance: Why the ADU Runs Hot or Cold
The complaint we hear most: the ADU is 78 degrees inside while the main house is at 72, and the contractor’s answer was to install a bigger mini-split. That’s almost always wrong. An undersized HVAC unit is rare. An undersized calculation is common.
ADUs have different load profiles than main houses. They’re smaller, often more airtight, and have a higher window-to-floor ratio. In Henderson, the cooling load in July drives the design, not the heating load in January. If the original Manual J load calculation treated the ADU like a scaled-down version of the main house, the numbers are wrong from day one.
Three causes to investigate before you buy a bigger unit:
- Manual J and Manual S errors. The load calculation and equipment selection were done by rule of thumb, not by calculation. Ask for the Manual J report. If the contractor can’t produce one, that is the answer.
- Ductwork in a hot attic or unconditioned space. In a garage conversion or detached ADU with attic ductwork, a 20 percent duct loss kills efficiency. The unit is fine. The delivery is not.
- Air sealing and insulation gaps. Recessed cans, attic hatches, and the electrical panel penetration are the usual culprits. A blower door test will find them in an hour.
The fix for a calculation error is a new load calculation, then the right-sized equipment and duct design. That’s a licensed mechanical contractor job, and modifying the HVAC system on a permitted ADU usually requires a mechanical permit. The fix for duct loss is duct sealing and re-insulation, sometimes duct relocation inside the thermal envelope. Neither fix is a bigger mini-split. A bigger unit makes the temperature swings worse and drives up your bill.
Electrical Capacity: Tripped Breakers and Shared Panels
The ADU breaker trips when the microwave and the toaster run together. Or when the mini-split kicks on while the water heater is recovering. Homeowners are told the panel is “just undersized” and quoted a panel upgrade. Sometimes that’s right. Often the real problem is load calculation.
When an ADU shares a panel with the main house, the original electrician was required to do a load calculation covering both structures. If the ADU was added after the main house was wired, and the original panel was sized for the house alone, the calculation was either skipped or assumed the ADU would be low-draw. It isn’t. A washer, dryer, water heater, mini-split, and kitchen appliances together draw more than most shared panels can serve.
What the fix looks like:
- If the panel has capacity: A licensed electrician re-does the load calculation and right-sizes the branch circuits. Sometimes this just means moving the ADU to a dedicated subpanel.
- If the service is maxed: A service upgrade from 100A to 200A, or a dedicated ADU meter, is the answer. In Henderson, that’s a permit-pulled job with a utility disconnect and reconnect.
- If the issue is a single circuit: A dedicated 20A circuit for the kitchen appliances is often enough. This is minor work, but still a licensed electrician and still an electrical permit.
Never let anyone talk you into a bigger breaker on the same wire. That’s how fires start.
Plumbing Venting: The Smell You Can’t Find
A bathroom sink that gurgles when the toilet flushes. A sewer smell in the ADU that comes and goes with weather. A drain that’s slow even after snaking. All three point to the same root cause: an improperly vented plumbing system.
Every plumbing fixture needs a vent that lets air in behind the water. In an ADU, vents are tricky because they have to run up through a smaller footprint and often a shallower attic. Three shortcuts show up constantly:
- An AAV (air admittance valve) used where code requires a true vent to atmosphere. AAVs fail. When they do, the trap sucks dry and you get sewer gas.
- A wet vent used incorrectly. One fixture’s drain is used to vent another. It works until someone flushes the toilet while the shower is running.
- The vent terminating in the attic instead of through the roof. This releases sewer gas into the attic, which finds its way into your living space. It also fails inspection, and if the ADU passed with this, the inspector missed it.
Diagnosing this is a licensed plumber job. Smoke testing and camera inspection will find the missing or improper vent. The fix usually involves running a proper vent stack through the roof, which is a permit-pulled repair. Sometimes it’s a simple AAV replacement, but only if the AAV is code-compliant for that fixture. You cannot fix a venting problem with drain cleaner or a snake. The water flows fine. The air doesn’t.
Exterior Finish Cracking in Desert Heat
Henderson sees summer highs above 110 degrees and winter lows into the high 20s. That’s a thermal cycle range of nearly 100 degrees every year. Stucco, siding, and caulk joints all move. The question isn’t whether you’ll see some cracking. It’s whether the cracking is normal movement or a sign of a real problem.
Normal hairline cracking in stucco, especially at control joints and corners, is maintenance. You seal it and move on. What is not normal:
- Diagonal cracking at window corners and door frames. This usually means a header or lintel is missing or undersized, or the framing wasn’t properly connected.
- Cracking along the entire length of a wall in a straight line. Often a foundation or slab movement issue, especially where the ADU meets the main house if it’s an attached build.
- Pieces of stucco separating from the substrate. Adhesion failure, usually from improper scratch coat application or moisture behind the wall.
- Caulk joints failing every single season. The wrong caulk was used. In Henderson you need a high-movement, UV-stable sealant at every joint, not painter’s caulk.
James Hardie siding performs better in this climate than stucco if it’s installed per spec with proper clearances. When we see a failing siding install in Henderson, it’s almost always a missing back-flashing detail or siding set too close to grade. The fix for structural cracking is a licensed contractor and usually a new permit. The fix for normal movement is maintenance, and it’s yours to own.
If you’re still in the planning phase and want to avoid these problems in the first place, our guide to ADU builders in Henderson walks through how to vet a builder before the first nail goes in.
Warranty vs. Maintenance: Who Pays for What
This is the line that causes the most conflict after move-in. Homeowners call it a defect. Contractors call it maintenance. Getting it right depends on distinguishing three categories.
Warranty items (the builder pays): anything caused by a construction defect, installation shortcut, or material failure. That includes improper flashing, missing vapor barriers, wrong-size equipment for the calculated load, missing vents, and structural cracking from missing headers. If the work was done wrong, the builder’s warranty covers it.
Maintenance items (you pay): normal wear-and-tear and owner negligence. Caulk joints that need resealing every 18 to 24 months in Henderson. Stucco hairline cracks. HVAC filter changes. Replacing a water heater element that fails after years of use. Not covered, ever, by any warranty worth the paper.
Gray area (the conversation): a crack that starts as movement and becomes structural. A caulk joint that fails because the wrong caulk was used. A mini-split that fails because it was undersized from the start. These need documentation and a professional to sort out.
The Garrison Standard covers workmanship defects for 365 days. If something fails inside that window, the crew returns and makes it right at no charge. The guarantee is written, it’s spelled out in what it covers and how long it runs, and it doesn’t leave the maintenance line blurry.
What Documentation You Need for a Warranty Claim in Nevada
If you’re pursuing a claim against your builder, the paper trail starts the day you sign the contract. If you don’t have these documents, get them now:
- The written contract and scope of work. What was promised, what was excluded, what brands and specifications were agreed on. This is the first document any dispute hinges on.
- All permits and inspection records. Nevada requires permits for ADUs, additions, and most structural, electrical, plumbing, and mechanical changes. Pull the inspection history from the city or county. If the permit was never pulled, that’s a serious red flag.
- The written warranty document. What’s covered, what’s excluded, how long, and how to file a claim. If your builder never provided one in writing, that’s the first thing to ask for.
- Photos and video with dates. Take them at the first sign of a problem. Include a tape measure in the frame when it matters. Then take them again every two weeks to show progression.
- Written communication. Emails, texts, and letters. Verbal promises do not count. If a contractor told you something important by phone, follow up with a text or email confirming what they said.
- Third-party inspection reports. A licensed contractor or inspector in Nevada can document the defect and its likely cause. This costs a few hundred dollars and is worth thousands in a dispute.
Nevada’s residential construction laws give homeowners specific remedies through the Nevada State Contractors Board. Filing a complaint with the Contractors Board is a formal step and often the fastest path to a resolution. Before you get there, though, most honest builders want a chance to fix a real defect. That’s why everything being in writing matters.
DIY Fix, Licensed Trade, or New Permit?
Not every problem needs a contractor. Some do, and some need a permit on top of the contractor. Here’s the honest sorting:
DIY-friendly (with care)
- Resealing exterior caulk joints with a high-movement, UV-stable sealant.
- Replacing HVAC filters and clearing condensate lines.
- Patching hairline stucco cracks with elastomeric patching compound.
- Tightening cabinet hardware and adjusting doors that have swollen with the seasons.
Licensed trade, usually no new permit
- Replacing a failed AAV with an identical unit if it’s accessible and code-compliant.
- Replacing a failed GFCI outlet with a like-for-like swap.
- Re-charging or servicing an HVAC system that is functioning correctly but underperforming.
Licensed trade plus a new permit (pulled by the contractor)
- Any modification to the HVAC system, electrical service, or plumbing venting.
- Opening walls to replace flashing, fix water intrusion, or replace structural framing.
- Any work that changes the building envelope or structure.
- Service upgrade from 100A to 200A, or adding a subpanel.
If a contractor tells you a permit isn’t needed for structural or envelope work on a permitted ADU, that contractor is telling you who they are. Believe them the first time.
Planning a garage conversion instead of a full new build? The problems are similar but the details differ. Our guide to garage conversion in Henderson covers the site-specific defects we see most on conversions. If you’re adding living space onto the main house rather than building a detached ADU, see our room addition contractor guide for Henderson.
Common Mistakes to Avoid
- Letting a contractor “fix” a hot ADU by installing a bigger mini-split. If the load calculation was wrong, the bigger unit makes the swing worse. Demand the Manual J report first.
- Caulking the interior baseboard to stop slab moisture. It hides the symptom for one season and pushes the water into the wall cavity. You’ll be replacing drywall next year.
- Accepting an AAV as the only vent for a fixture that requires a true vent. It fails. When it does, you get sewer gas in the ADU. Henderson inspectors will flag it on any resale inspection.
- Skipping a permit for a “small repair” on an ADU. Any structural, envelope, electrical, plumbing, or HVAC change to a permitted ADU needs a permit in Henderson. Unpermitted repairs can void your warranty and create resale headaches.
- Believing verbal promises about warranty coverage. If it’s not in writing with specific terms, it’s not a warranty. Get it in writing before work starts.
- Using painter’s caulk at exterior joints in the Henderson climate. It fails within one summer. High-movement, UV-stable sealant is the only substance that survives a 100-degree annual swing.
- Waiting until a defect is catastrophic to call. Small leaks become mold. Small cracks become structural. Small electrical issues become fires. Call at the first sign.
When to Call a Professional
Call a licensed professional if you see water coming from inside a wall, a breaker tripping more than once a month, sewer smell in the ADU that returns after cleaning, a crack wider than a credit card, or any HVAC problem where the system was installed within the last year. In Henderson, the combination of intense summer heat and monsoon-season moisture turns small defects into expensive ones fast. If you’re not sure, that’s also a reason to call. A free estimate from a licensed builder will tell you whether the problem is your maintenance line or the original contractor’s warranty line, and that conversation is worth having early rather than after a wall comes open.
Fielding ADU Builders Henderson offers free estimates in Henderson. Call (855) 953-5331 to schedule yours. We’re an independently owned member of the Garrison Partners family, working to The Garrison Standard on every build. Written price before any work starts. Every project covered by a full one-year written guarantee. If the work fails in that year, we come back and make it right at no charge.
Frequently Asked Questions

Most root-cause repairs we handle take one to four weeks depending on whether a permit is required. Slab moisture remediation on a Henderson ADU typically runs two to three weeks if exterior walls must open. HVAC calculation and equipment right-sizing runs three to five days plus permit review. Plumbing venting corrections are usually two to four days. Cosmetic patches take an afternoon and fail again within a season.
No. Caulk resealing, filter changes, minor stucco hairline cracks, and general wear are always homeowner maintenance. The Garrison Standard covers workmanship defects for 365 days. The written guarantee spells out exactly what falls on each side of that line, so you’re not arguing about it later.
Only if you’re replacing a failed outlet or breaker with an identical unit at the same amperage on the same circuit. Any capacity change, added circuit, or service upgrade requires a licensed electrician and an electrical permit. Never install a bigger breaker on existing wire, even if the trips stop. That’s how house fires start.
Almost always a load calculation or duct delivery problem, not an equipment problem. ADUs have different load profiles than main houses because of higher window-to-floor ratios and different air sealing. Ask for the Manual J report. If the original builder can’t produce one, that’s the problem. In Henderson’s summer heat, this shows up in June and gets worse through September.
Any structural, envelope, electrical, plumbing, or HVAC change requires a permit in Henderson. Cosmetic repairs like caulk resealing, painting, and filter changes do not. When in doubt, ask the contractor to pull the permit – if they resist, that’s your answer about who they are. We pull all permits on every repair project we take on.
Start with written documentation: the contract, the permit records, the written warranty, dated photos, and email or text records of every conversation. File a complaint with the Nevada State Contractors Board if the builder is licensed and unresponsive. If you’re in Henderson and want a second opinion before you go that route, call (855) 953-5331 for a free estimate. Sometimes a written third-party inspection report is enough to get an honest builder back on site.
The Bottom Line
Every problem in this guide was predictable at the design or build phase. Moisture, HVAC sizing, electrical capacity, plumbing venting, and exterior finish cracking all trace back to calculation errors, installation shortcuts, or material failures – not accidents. If you’re facing a post-construction issue right now, the first step is distinguishing a defect from maintenance and getting the documentation in order. The second step is a licensed contractor who will diagnose the root cause instead of patching the symptom. In Henderson, the climate is unforgiving enough that cosmetic fixes don’t survive. Real fixes do. And a written price before any work starts, backed by a full one-year written guarantee on the work itself, is the difference between a repair that holds and one you’re paying for again next summer.
For a free estimate on any ADU repair, conversion, or addition in Henderson, call (855) 953-5331. Our technicians have up to 20 years of experience, every crew member is background-checked and arrives in uniform, and every call is answered by a live person around the clock. Start at our Fielding ADU Builders Henderson home page to see what we build and how we price it.