What Is a Junior ADU in Henderson, NV? The Inside-the-House Unit Most Homeowners Haven’t Heard Of
A Junior ADU (often written JADU) is a small, self-contained legal living unit of no more than 500 square feet carved out of the existing footprint of your primary home. It has its own entry, its own efficiency kitchen, a bathroom, and its own permit from the city. In Henderson, the JADU is the one ADU type that typically sidesteps HOA architectural review, because it adds no new structure and no visible change to the home’s exterior envelope. For a homeowner in a tightly regulated master-planned subdivision, that single fact can save months. If you want to know whether your house qualifies, call Fielding ADU Builders Henderson at (855) 953-5331 and we’ll walk your floor plan with you.
Key Takeaways
- A Junior ADU is capped at 500 sq ft and lives entirely inside the existing house.
- It needs an efficiency kitchen (cooktop, counter, sink), its own exterior entry, and a private or shared bathroom.
- It is a legal rental unit with its own permit and address suffix, not just a bedroom with a lock.
- Because it creates no new structure, most Henderson HOA CC&Rs don’t trigger architectural review.
- Nevada requires the primary homeowner to live in either the main home or the JADU.

Why the JADU Bypass Matters More in Henderson Than Almost Anywhere in Nevada
Henderson is a master-planned city built almost entirely between the 1990s and the 2020s. Green Valley, Anthem, Seven Hills, Cadence, and Inspirada are stucco-and-tile subdivisions on tight lots, and nearly every one of them was platted with recorded CC&Rs and lot-coverage limits before Nevada passed its ADU preemption statutes.
That history shapes the whole approval process here. A detached casita or a garage conversion has to clear two hurdles: City of Henderson zoning (allowable in many single-family zones under state preemption via AB 73 and AB 133) and a private HOA architectural committee that can be stricter than the city itself. In Inspirada and Cadence the committees routinely require ADU exterior finishes, roof pitch, and color to match the primary home exactly. Plenty of Green Valley lots carry rear-yard setback and lot-coverage limits recorded long before the state statutes, so a plan the city approves can still stall at review.
A Junior ADU avoids most of that friction. Because nothing new goes on the lot and the outside of the house barely changes beyond a new door, most Henderson CC&Rs don’t treat it as new construction. That makes it the fastest approval path in an HOA-saturated city, and it’s the reason we get asked “what is a junior adu” more than any other ADU question in this market.
Curious how that compares with the other path? Our guide to a Junior ADU & Interior Conversion in Henderson walks through the interior build side in detail.
JADU vs. ADU vs. a Room Conversion: What’s the Real Difference?
A Junior ADU is a legally distinct unit type, not a lighter version of the same thing. Under Nevada’s ADU statutes, it is a unit created within the walls of an existing single-family home, using space that’s already there. It’s not a new structure in the backyard and not a garage conversion. If you’re converting a detached garage or adding a casita, that’s a standard ADU with its own foundation and roofline.
A standard room conversion is different again. Turning a spare bedroom into a studio with a hot plate is remodeling, not a legal unit. A JADU carries its own city-issued permit, its own address suffix, and its own lease. That legal status is the reason it matters. For rent income, an insured rental, and eventual resale value, a permitted JADU is a documented second unit. A bedroom with a lock on the door is just a bedroom.
Here’s the comparison in plain terms:
| Feature | Junior ADU (JADU) | Standard ADU | Room Conversion |
|---|---|---|---|
| Where it lives | Inside the existing home footprint | Detached casita, garage conversion, or attached addition | Inside the home |
| Size cap | 500 sq ft max | Set by city zoning | No legal unit |
| Kitchen | Efficiency kitchen (cooktop, counter, sink) | Full kitchen | Whatever you install |
| Exterior change | New entry door only, typically | New structure or major alteration | None |
| HOA architectural review | Usually not triggered | Almost always required | Usually not triggered |
| Legal rental unit | Yes, with permit and address suffix | Yes | No |

What Does a Junior ADU Cost in Henderson, and Who’s Allowed to Live There?
Most Henderson Junior ADU projects land in the $65,000 to $140,000 range depending on how much plumbing and electrical you’re moving, and that number includes the City of Henderson permit fees and plan submittal. A straightforward interior conversion with an existing bathroom in roughly the right place sits at the low end. A build that has to relocate drain lines, add a dedicated subpanel, or carve out a new exterior door runs toward the high end.
Two things drive the price more than anything else. First, drain-line location: if the new kitchen and bathroom can share the existing waste stack, you save real money. Second, the property’s electrical capacity: a JADU with its own cooktop, mini-split HVAC, and water heater usually needs a dedicated circuit run, and in older Green Valley homes the panel may not have room.
On occupancy, Nevada requires the primary homeowner to live on the property, in either the main house or the JADU itself. If you’re an investor planning to rent both spaces out, that rule closes the door. For the typical Henderson homeowner adding a casita for a parent or an adult child, it’s a non-issue.
On the construction side, Caliche-heavy soil and monsoon-season flash flooding don’t hit a JADU the way they hit a detached casita, since there’s no new slab and no new trenching to the back of the lot. That’s a quiet cost advantage. Where our crews do focus is heat: with summers routinely at 105 to 115F, we spec insulation, zoned HVAC, and shading so an inside unit stays livable through August. Whether you build inside or look at prefab options like Cover or Dvele for a different layout, we match the build method to your lot and budget.
How Fielding Handles the Permit Path and the Price
Fielding ADU Builders Henderson is an independently owned and operated member of the Garrison Partners family, and we build to The Garrison Standard: show up in the window, price in writing, build by the book, leave it clean, and stand behind it for a year. We’ve operated that way since 2006.
For a JADU, that means we handle the full permit submittal to the City of Henderson, including the plan set, the efficiency-kitchen spec, and the address-suffix paperwork. Before any walls are touched, you get a written price. The number you approve on day one is the number on the final invoice. Every JADU we build carries our 365-Day Done Right Promise: if something fails within a full year, we come back and make it right at no charge.
Every technician on your job is background-checked and arrives in uniform, and our technicians have up to 20 years of experience. Someone answers the phone around the clock, whether you call at noon or midnight. That matters most on the JADU projects where the approval path is smooth but the interior build has a dozen small decisions to get right.
FAQs About Junior ADUs in Henderson
Usually not, though it depends on your specific CC&Rs. Because a Junior ADU adds no new structure and typically changes nothing on the exterior beyond a new door, most Henderson HOA architectural committees don’t require review. We read your CC&Rs and confirm before a permit is filed, so you’re not surprised months in.
No. A Junior ADU is carved from inside the existing living space of your home. A garage conversion is a standard ADU because it changes the footprint’s use and typically requires its own foundation work and a full kitchen. The size cap on a JADU is 500 sq ft, and it uses an efficiency kitchen rather than a full one.
Yes, as long as you live in the main home or the JADU itself. Nevada requires the primary homeowner to occupy one of the two units. The JADU is a legal rental unit with its own permit and address suffix, and that documented status supports rent income, insurance, and resale value.
Most Henderson JADU projects run about 4 to 7 months, with the shorter end for a build where the bathroom and kitchen share the existing plumbing. Because the JADU usually skips HOA architectural review, we typically start permit work within the first two weeks instead of losing six weeks to a design review.
If you’d rather have it looked at, Fielding ADU Builders Henderson offers a no-pressure assessment in Henderson - call (855) 953-5331. We’ll confirm whether your floor plan supports a Junior ADU and give you a written price before any work begins. Start with the home page to see what we build across the valley.
Written by the team at Fielding ADU Builders Henderson, serving Henderson, NV.


